Becton Dickinson
Client: Becton Dickinson Medical (S) Pte Ltd
Services: Mechanical & Electrical Services –Design Construct & Various works
Project Highlights
- Expansion and upgrading of the medical equipment manufacturing plant compressed air system. Works included engineering, installation, testing and commissioning.
- Install a 500 Horse Power High capacity Air Compressor, a 5000 litres air receiver and 8 units of dominic hunters air dryers
- Upgraded a new higher capacity 400kW cooling tower and recirculating water pumps, control valves and changing of the galvanized iron pipe work circuit.
- Upgraded new electrical system from LT panels to new additional equipments, installed to provide for the new load
- The entire additions and upgrading was completed within 1 month period
- Construction of 10K & 100K cleanroom